Hydroelectric Plants And Dams

Recuperação Engenharia carries out inspections, rehabilitation and strengthening projects of hydroelectric plants (HPP and SHP) and in concrete and soil dams, including civil constructions, buildings, spillways and galleries. The following cases are examples of the experience of Recuperação Engenharia in this market:

arcelor-mittal-barragem-jacui-joao-monlevade

Client: Arcelor Mittal

Activities: Inspection of Jacuí Dam – João Monlevade (MG).

Year: 2002 – 2018

Description: Annual inspection of the concrete dam structures within the

Maintenance Plan implemented in all the structures of the João Monlevade (MG) industrial plant.

vale-barragem-santana-itabira

Client: Vale

Activities: Santana Dam – Itabira (MG).

Year: 2020

Description: Structural Integrity Report of the reinforced concrete gallery that was used as a riverbank of the Santana Dam in Itabira (MG).

vale-barragens-5-e-7b-nova-lima

Client: Vale

Activities: Spillways of the 5 and 7B Dams at Águas Claras Mine in Nova LIma (MG) and Capanema Mine in Santa Bárbara (MG).

Year: 2018 – 2019

Description: Inspection and structural rehabilitation project for the spillways of Dams 5 and 7B of the Águas Claras Mine in Nova Lima (MG) and Capanema in Santa Bárbara (MG). Technical Construction Monitoring (TCM) in the rehabilitation works.

ctg-uhe-taquarucu-sandovalina

Client: CTG Brazil

Activities: HPP of Taquaruçu Dam – Sandovalina (SP).

Year: 2018

Description: Inspection and structural rehabilitation project of the Taquaruçu HPP fire walls in Sandovalina (SP).